Matt Groening Quotes
We've been running a little behind schedule. But only by about 15 years or so.
Groening, Matt. Interview by John Hiscock. The Daily Telegraph, 13 Jul. 2007.
Asked by reporters if the 10-year mark might prove to be a fatal politcal threshold, as in the case of former British prime minister Margaret Thatcher:
Appears in early Hindu religious literature.
Matthew Abram Groening is an American cartoonist, writer, producer, and animator. He is the creator of the comic strip Life in Hell (1977–2012) and the television series The Simpsons (1989–present), Futurama (1999–2003, 2008–2013), and Disenchantment (2018–present). The Simpsons is the longest-running U.S. primetime-television series in history and the longest-running U.S. animated series and sitcom.