Martin Filler Quotes
Cost overruns are not uncommon in architecture, particularly for designs that depart from structural or technological norms, or demand a finer quality of execution than commercial schemes - conditions typical of buildings for cultural institutions. Budgets are exceeded for many reasons, not all of them within an architect's control.
Filler, Martin. Architecture and Its Discontents. New York Review Books, 2014.
The Clinton budget was a very unusual one. He and Treasury Sectary Robert Rubin determined that the large deficit built up in the previous administrations and the high interest rate were competing with the private sector for investment capital. Therefore the budget raised taxes and took other steps to reduce the largest deficit then in American History. Virtually all of the Republicans saw disaster for the economy with this budget and even some of the fiscal conservatives from Clinton’s own party were opposed. Boren, normally a wise and sound Senator, had bought into the Republican ideology and mantra that raising taxes will slow the economy. The budget passed by a single vote in the House, and that started the largest economic growth period in American History. The economy became so strong that Clinton was able to produce a balanced budget, eliminate the Reagan deficit, and produce more new jobs than any administration in American history. The prediction that the budget would cause the country to fail was, not only wrong, but the budget caused the nation to succeed, beyond what any thought possible. See {626774} for Clinton’s argument for the budget.
Martin Myles Filler is a prominent American architecture critic. He is best known for his long essays on modern architecture that have appeared in The New York Review of Books since 1985, and which served as the basis for his 2007 book Makers of Modern Architecture, published by New York Review Books.